Fixed firefighting systems - Water mist systems - Part 6: Test protocol for false floors and false ceilings for automatic nozzle systems
€69.00
Fixed firefighting systems - Water mist systems - Part 11: Test protocol for cable tunnels for open nozzle systems
€62.00
Fixed firefighting systems - Water mist systems - Part 7: Test protocol for commercial low hazard occupancies for automatic nozzle systems
Fixed firefighting systems - Components for sprinkler and water spray systems - Part 12: Pumps
Fire extinguishing systems in commercial kitchens - System design, documentation, and test requirements - Fire test procedures for plenum and ducts
€47.00
Portable fire extinguishers. Vocabulary.
€28.00
Fire resistance tests for service installations - Part 8 : smoke extraction ducts
€108.00
Building hardware - Panic exit devices operated by a horizontal bar, for use on escape routes - Requirements and test methods - Quincaillerie pour le bâtiment
€100.63
Building hardware - Emergency exit devices operated by a lever handle or push pad, for use on escape routes - Requirements and test methods - Quincaillerie pour le bâtiment
€128.67
Fire safety - Building - Interior fitting materials - Classification according to their reaction to fire - Sécurité contre l'incendie
€41.00
Fire safety systems - Operated safety systems - Part 1 : general requirements - Systèmes de Sécurité Incendie (S.S.I.)
€78.00
Fire safety systems - Operated safety systems - Part 2 : Automatic closing swing doors - Systèmes de Sécurité Incendie (S.S.I.)
€51.24
Communication cables - Specifications for test methods - Part 4-12 : environmental test methods - Vertical flame spread test on bunched small communication cables - Câbles de communication
€59.33
Reaction-to-fire tests - Heat release, smoke production and mass loss rate - Part 1 : heat release rate (cone calorimeter method) and smoke production rate (dynamic measurement) - Essais de réaction au feu
€141.33
Testing of valves - Fire type-testing requirements - Essais des appareils de robinetterie