Fire resistance tests — Fire dampers for air distribution systems — Part 1: Mechanical dampers
€163.00
Fire resistance tests — Door and shutter assemblies — Part 1: General requirements
€184.00
Fire resistance tests — Part 3: Door and shutter assemblies horizontally oriented
€89.00
Fire-resistance tests — Elements of building construction — Part 13: Requirements for the testing and assessment of applied fire protection to steel beams with web openings
€142.00
Fire-resistance tests — Elements of building construction — Part 14: Requirements for the testing and assessment of applied fire protection to solid steel bar
€121.00
Fire-resistance tests — Elements of building construction — Part 2: Requirements and recommendations for measuring furnace exposure on test samples
Cellular plastics — Determination of horizontal burning characteristics of small specimens subjected to a small flame
Reaction-to-fire tests for sandwich panel building systems — Part 2: Test method for large rooms
Fire resistance tests — Door and shutter assemblies — Part 4: Linear joint fire seal materials used to seal the gap between a fire door frame and the supporting construction
€58.00
Fire detection and fire alarm systems - Part 1: Rules for risk analysis and assessment of the needs, the study and the design, installation, commissioning, control, use, inspection and maintenance
€50.00
Fire protection — Automatic sprinkler systems — Part 1: Requirements and test methods for sprinklers
€205.00
Smoke and heat control systems — Part 3: Specifications for powered smoke and heat exhaust ventilators
Fire resistance tests — Fire dampers for air distribution systems — Part 2: Intumescent dampers
Fire resistance tests — Elements of building construction — Requirements for active fire curtains
Determination of the resistance to jet fires of passive fire protection materials — Part 1: General requirements