Fire-fighting - Positive-pressure proportioning systems (PPPS) and compressed-air foam systems (CAFS)
€163.00
Fire-fighting pumps - Portable pumps - Safety and performance requirements, tests
Fire-fighting pumps - Fire-fighting centrifugal pumps with primer - Part 1: Classification - General and safety requirements
€142.00
Smoke and heat control systems - Part 4: Installed SHEVS systems for smoke and heat ventilation
€184.00
Fire resistance tests for service installations - Part 9: Single compartment smoke extraction ducts
€50.00
Fixed firefighting systems - Powder systems - Part 1: Requirements and test methods for components
Fire detection and fire alarm systems - Part 21: Alarm transmission and fault warning routing equipment
Fixed firefighting systems - Condensed aerosol extinguishing systems - Part 2: Design, installation and maintenance
Ventilation for buildings - Fire precautions for air distribution systems in buildings
€121.00
Fire detection and fire alarm systems - Part 2: Control and indicating equipment
€20.00
Fire resistance tests for service installations - Part 8: Smoke extraction ducts
Fire safety - Vocabulary (ISO 13943:2023)
€187.00
Fire resistance and smoke control tests for door and shutter assemblies, openable windows and elements of building hardware - Part 3: Smoke control test for door and shutter assemblies
Fire resistance and smoke control tests for door, shutter and openable window assemblies and elements of building hardware - Part 2: Fire resistance characterisation test for elements of building hardware
Fixed firefighting systems - Gas extinguishing systems - Part 1: Design, installation and maintenance (ISO 14520-1:2006, modified)