Extended application of results from fire resistance tests - Non-loadbearing walls - Part 4: Glazed constructions
€50.00
Smoke and heat control systems - Part 4: Installed SHEVS systems for smoke and heat ventilation
Railway applications - Fire protection on railway vehicles - Part 5: Fire safety requirements for electrical equipment including that of trolley buses, track guided buses and magnetic levitation vehicles
Mobile fire extinguishers - Part 3: Requirements for the assembly, construction and pressure resistance of CO2 extinguishers which comply with the requirements of EN 1866-1
€89.00
Mobile fire extinguishers - Part 2: Requirements for the construction, pressure resistance and mechanical tests for extinguishers, with a maximum allowable pressure equal to or lower than 30 bar, which comply with the requirements of EN 1866-1
€121.00
Portable equipment for projecting extinguishing agents supplied by firefighting pumps - Portable foam equipment - Part 4: High expansion foam generators PN16
Fire resistance and smoke control tests for door and shutter assemblies, openable windows and elements of building hardware - Part 1: Fire resistance test for door and shutter assemblies and openable windows
Fire detection and fire alarm systems - Part 5: Heat detectors - Point heat detectors
Mounting and fixing in reaction to fire tests under the Construction Products Directive
€163.00
External fire exposure of roofs and roof coverings - Extended application of test results from CEN/TS 1187
€205.00
Fire detection and fire alarm systems - Part 14: Guidelines for planning, design, installation, commissioning, use and maintenance
Fire detection and fire alarm system - Part 31: Multi-sensor fire detectors - Point detectors using a combination of smoke, carbon monoxide and optionally heat sensors
Space product assurance - Flammability testing for the screening of space materials
Fire classification of construction products and building elements - Part 6: Classification using data from reaction to fire tests on electric cables
Extended application of results from fire resistance tests - Non-loadbearing ceilings - Part 7: Metal sandwich panel construction