Cogeneration systems — Technical declarations for planning, evaluation and procurement
€183.00
Turbines à gaz - Essais de réception
€166.50
Gas turbine combined cycle power plants — Thermal performance tests
€77.00
Règles pour les essais thermiques de réception des turbines à vapeur - Partie 1 : méthode A - Haute précision pour les turbines à vapeur à condensation de grande puissance
€175.33
Mechanical vibration — Measurement and evaluation of machine vibration — Part 2: Land-based gas turbines, steam turbines and generators in excess of 40 MW, with fluid-film bearings and rated speeds of 1 500 r/min, 1 800 r/min, 3 000 r/min and 3 600 r/min — Amendment 1
€20.00
Water-tube boilers and auxiliary installations - Part 6: Inspection during construction, documentation and marking of pressure parts of the boiler
€163.00
Water-tube boilers and auxiliary installations - Part 2: Materials for pressure parts of boilers and accessories
€50.00
Water-tube boilers and auxiliary installations - Part 5: Workmanship and construction of pressure parts of the boiler
Water-tube boilers and auxiliary installations - Part 6: Inspection during construction; documentation and marking of pressure parts of the boiler
Water-tube boilers and auxiliary installations - Part 10: Requirements for safeguards against excessive pressure
Water-tube boilers and auxiliary installations - Part 10: Requirements for safety devices against excessive pressure
€89.00
€205.00
Water-tube boilers and auxiliary installations - Part 11: Requirements for limiting devices of the boiler and accessories
IEEE Standard for Hydraulic Turbine and Generator Shaft Couplings and Shaft Runout Tolerances
€81.00