Nuclear instrumentation - ECL (Emitter Coupled Logic) front panel interconnections in counter logic (IEC 60912:1996)
€41.78
Laboratory equipment - Gloves boxes - Part 2: Leakage test
Construction of concrete hot cells - Part 3: Requirements for shielding windows for concrete walls with different densities
€63.27
Construction of concrete hot cells - Part 3: Requirements for shielding windows for concrete walls with different densities; information for installation
Construction of concrete hot cells - Part 4: Requirements of shielding windows for concrete walls density 2,3 g/cm with different thicknesses
Hot cells, preventive fire protection
€56.17
Radioisotope laboratories - Part 5: Rules for the decontamination of surfaces
€69.91
Programme for hot cell shielding with gamma point sources
€98.32
Fume hoods for radioactive materials - Rules for construction and tests
Radioisotope laboratories - Part 4: Rules for the protection of persons
Radioisotope laboratories - Part 4: Rules for the protection of persons; Guidance notes on preparing a radiation protection directive for handling radioaktive sources in radioisotope laboratories
€34.30
Radioisotope laboratories - Part 4: Rules for the protection of persons; Guidance notes on shielding of gamma- and beta-radiation
€111.40
Radionuclide laboratories - Part 3: Rules for preventive fire protection