Space systems — Failure reporting, analysis and corrective action (FRACA) process requirements
€155.00
Space Data System Practices — Reference model for an open archival information system (OAIS)
€261.00
Space data and information transfer systems — Audit and certification of trustworthy digital repositories
€235.00
Space data and information transfer systems — Requirements for bodies providing audit and certification of candidate trustworthy digital repositories
Space data and information transfer systems — Information preparation to enable long term use
Space systems — Requirements and guidelines for the management of systems engineering
€115.00
Space systems — Product assurance requirements for commercial satellites
Space systems — Launch complexes modernization process — General requirements
€77.00
Space systems — Structural design — Determination of loading levels for static qualification testing of launch vehicles
This product is not for sale, please contact us for more information
Space systems — Dynamic and static analysis — Exchange of mathematical models
Space systems — Launch pad and integration site — Facility, system and equipment failure analysis
Space systems — Programme management — Risk management
Space project management - General requirements - Part 2: Project breakdown structure.
€60.00
Space project management - General requirements - Part 3: Project organization.
€62.00
Space project management - General requirements - Part 4: Project phasing and planning.