Superseded
Standard
Historical
ASTM E1804-02
Standard Practice for Performing and Reporting Cost Analysis During the Design Phase of a Project
Summary
1.1 This practice covers an arranged method for providing cost analysis during the design phase of buildings.
1.2 The use of this practice increases the level of communication between the design professional, owner, and the cost professional providing the cost consulting services.
1.3 The practice establishes a structured method to support design decisions.
1.4 The practice provides design and cost professionals with a framework for historically tabulating information to be used on relevant future projects.
Technical characteristics
| Publisher | American Society for Testing and Materials (ASTM International) |
| Publication Date | 06/10/2002 |
| Collection | |
| Page Count | 4 |
| Themes | Construction industry in general |
| EAN | --- |
| ISBN | --- |
| Weight (in grams) | --- |
Replaces
01/01/1996
Superseded
Historical
Previous versions
01/10/2016
Superseded
Historical
01/10/2016
Active
, Reaffirmed
Most Recent
01/04/2012
Superseded
Historical
01/04/2007
Superseded
Historical
10/06/2002
Superseded
Historical
01/01/1996
Superseded
Historical