Superseded Standard
Historical

BS 1139-6:2014

Metal scaffolding Prefabricated tower scaffolds outside the scope of BS EN 1004, but utilizing components from such systems. Specification

Summary

Temporary structures;Scaffolding components;Mobile scaffolds;Prefabricated parts;Construction equipment;Tower scaffolds;Scaffolds;Prefabrication;Structural design

Technical characteristics

Publisher British Standards Institution (BSI)
Publication Date 12/31/2014
Cancellation Date 01/27/2022
Page Count 34
Themes Structural design
EAN ---
ISBN ---
Weight (in grams) ---
No products.