Summary
The document contains requirements for the utilization of soil material with and without pretreatment. Soil material according to this document is excavated soil or dredged material, usually deriving through construction, maintenance and rehabilitation processes. Out of scope is the deposition of soil material into existing waters and cavitations (fillings).
Technical characteristics
| Publisher | Deutsche Institut für Normung e.V. (DIN) |
| Publication Date | 05/01/1998 |
| Page Count | 13 |
| EAN | --- |
| ISBN | --- |
| Weight (in grams) | --- |
No products.
Previous versions
01/07/2021
Superseded
Historical