Superseded
Draft standard
Historical
DIN EN 16907-3:2015-12
Earthworks - Part 3: Construction procedures; German and English version prEN 16907-3:2015
Summary
This standard presents execution procedures for excavating, transporting and placing soils and rocks for the construction of earth-structures. It includes excavation and placement of rock materials underwater.Dredging of soils and the associated hydraulic placement of fills are covered by Part 6 of this standard.NOTE:Execution of earthworks follows the conclusions of the earthworks design and optimisation phase (Part 1), which must anticipate soil and rock specificities and their suitability. In case some events could not be foreseen, additional design is performed during the execution of works
Technical characteristics
| Publisher | Deutsche Institut für Normung e.V. (DIN) |
| Publication Date | 12/01/2015 |
| Cancellation Date | 04/01/2019 |
| Page Count | 189 |
| EAN | --- |
| ISBN | --- |
| Weight (in grams) | --- |
No products.
Previous versions
01/04/2019
Active
Most Recent
01/12/2015
Superseded
Historical