Active Standard
Most Recent

IEEE C37.242:2021

IEEE Guide for Synchronization, Calibration, Testing, and Installation of Phasor Measurement Units (PMUs) for Power System Protection and Control

Summary

Revision Standard - Active.
Guidance for synchronization, calibration, testing, and installation of phasor measurement units (PMUs) applied in power systems is provided. The following are addressed in this guide: (a) considerations for the installation of PMU devices based on application requirements and typical substation electrical bus configurations; (b) techniques focusing on the overall accuracy and availability of the time synchronization system; (c) test and calibration procedures for PMUs for laboratory and field applications; and (d) communications testing for connecting PMUs to other devices including phasor data concentrators.

This guide provides guidance for synchronization, calibration, testing, and installation of phasor measurement units (PMUs) applied in power system protection and control. The following are addressed in this guide: a) Considerations for the installation of PMU devices based on application requirements and typical bus configurations. b) Techniques focusing on the overall accuracy and availability of the time synchronization system. c) Test and calibration procedures for PMUs for laboratory and field applications. d) Communications testing for connecting PMUs to other devices including Phasor Data Concentrators (PDCs).
This guide is intended to be used by power system protection professionals for PMU installation and covers the requirements for synchronization of field devices and connection to other devices including PDCs.

Notes

Active

Technical characteristics

Publisher Institute of Electrical and Electronics Engineers (IEEE)
Publication Date 10/14/2021
Cancellation Date 10/14/2021
Edition
Page Count 98
EAN ---
ISBN ---
Weight (in grams) ---
Brochures https://subscriptions.normadoc.com/media/cache/resolve/app_product_document_thumbnail/dc/b6/79d0e467446b6a5a09191eaec2de.png