Active
, Reaffirmed
Standard
Most Recent
ISO 18828-2:2016 (R2022)
Industrial automation systems and integration — Standardized procedures for production systems engineering
Part 2: Reference process for seamless production planning
Part 2: Reference process for seamless production planning
Summary
ISO 18828-2:2016 describes a reference planning process for seamless production planning. The scope of the discussed reference process focusses on the planning of production systems such as make-to-stock or assemble-to-order production. The analysis of the process activities has been limited to those within the production planning. The following aspects are within the scope of ISO 18828-2:2016: · general overview of the reference planning process; · basic principles of the process model; · description of each level identified within the reference planning process for production planning; · structure of activities and relations within each planning discipline; · dependencies of interdisciplinary activities. The following items are outside the scope of ISO 18828-2:2016: · material requirement planning/manufacturing resource planning; · production order control; · production process; · early stage product design; · order management, inventory management, purchasing, transportation, warehousing; · production facilities planning/manufacturing facilities planning (physical plant and equipment), including any kind of resource that is not directly related to the manufacturing process; · value chain (inbound logistics, operations management, outbound logistics, marketing and sales); · resource visualization; · process simulation.
Notes
90.93 : Norme internationale confirmée
Technical characteristics
| Publisher | International Organization for Standardization (ISO) |
| Publication Date | 10/19/2016 |
| Confirmation Date | 08/08/2022 |
| Edition | 1 |
| Page Count | 32 |
| EAN | --- |
| ISBN | --- |
| Weight (in grams) | --- |
No products.