Active Standard
Most Recent

ISO 4917-6:2024

Design of nuclear power plants against seismic events
Part 6: Post-seismic measures

Summary

This document applies to nuclear power plants with water cooled reactors. This document does not apply to earthquakes stronger than the design basis earthquake. This document specifies guidance on the actions to be taken in preparation for and following an earthquake at a nuclear power plant. This document is intended to be used as a guideline for decision making regarding continued operation, shutdown and restart of the nuclear power plant after an earthquake. It can also be used to assist operating organizations in the preparation and implementation of an overall pre- and post-earthquake action programme for dealing with situations in accordance with the level of seismic ground motion experienced at the site, and the seismic design level of the plant.

Notes

60.60 : Norme internationale publiée

Technical characteristics

Publisher International Organization for Standardization (ISO)
Publication Date 02/27/2024
Edition 1
Page Count 12
EAN ---
ISBN ---
Weight (in grams) ---
No products.