Active
Standard
Most Recent
ISO/TR 13624-2:2009
Petroleum and natural gas industries — Drilling and production equipment
Part 2: Deepwater drilling riser methodologies, operations, and integrity technical report
Part 2: Deepwater drilling riser methodologies, operations, and integrity technical report
Summary
ISO/TR 13624-2:2009 pertains to mobile offshore drilling units that employ a subsea BOP stack deployed at the seafloor. It is intended that the drilling riser analysis methodologies discussed in this part of ISO 13624 be used and interpreted in the context of ISO 13624-1.
Notes
60.60 : Norme internationale publiée
Technical characteristics
| Publisher | International Organization for Standardization (ISO) |
| Publication Date | 11/24/2009 |
| Edition | 1 |
| Page Count | 89 |
| EAN | --- |
| ISBN | --- |
| Weight (in grams) | --- |
No products.