Active Rules
Most Recent

RSE-M:2024

In-service inspection, intallation and maintenance rules for mechanical components of PWR

Summary

The in-service inspection and maintenance rules for mechanical equipments of PWR in this document describe the current practice in the French nuclear industry, plus the requirements of the regulations, and are primarily concerned with equipments covered by safety classification.





This Code defines the minimum rules that apply to:


- the Pre-Service Inspection (PSI (VCI)),


- the In-Service Inspection (ISI) of equipments in service,


- the maintenance operations performed on equipments in service.

Technical characteristics

Publisher Association française pour les règles de conception, de construction et de surveillance en exploitation des matériels des chaudières électro-nucléaires (AFCEN)
Publication Date 01/01/2024
Edition 2024
Page Count 0
EAN ---
ISBN ---
Weight (in grams) ---

Replaces

01/01/2022
Superseded
Historical